BIOROCK-S Installation in Berkshire

BIOROCK-S Installation in Berkshire

Location

Maidenhead, Berkshire

Project

2 Bedroom Annex with Studio.

System

BIOROCK-S System with ST1-2000 Primary Tank & BIOROCK-S Treatment Unit

Background

The client had the option to connect to the mains but the costs, permitting time and access permits proved prohibitive. As the plant was to be located quite close to the building the client also wanted a plant without noise and with minimum maintenance. It was also planned to discharge to a nearby stream and required a high quality final effluent.

Installation

Installation was carried out by the clients contractor under the supervision of a BIOROCK engineer and was completed in less than 2 days.

Vil du komme i kontakt med oss?

Hei jeg heter José Manuel Rodríguez , International Sales Director av BIOROCK. Kontakt oss nå for en GRATIS prosjektvurdering.

Hvor befinner du deg?

Hvem er du?

Dine kontaktdata

Landskode angis automatisk etter valg av land

Hva er din interesse?

Hvis du velger annet, vennligst spesifiser i emnefeltet

Hvordan kan vi hjelpe deg?