321

Above ground wastewater treatment plant, North of Stockholm, Sweden

Above ground wastewater treatment plant, North of Stockholm, Sweden

Location

  North of Stockholm, Sweden

Project

Vacation home: septic system upgrade

System

BIOROCK-S System with ST1-2000 Primary Tank & BIOROCK-S Treatment Unit / UV desinfection (tertiary treatment)

Background

The client had no option to connect to the mains. As the Wastewater Treatment Plant was to be located in a stony area the client needed an above-ground plant but without noise and with minimum maintenance. It also required a high quality final effluen: The last module includes an UV desinfection system.

Installation

Installation was carried out by one of our trained contractors and was completed in less than 2 days.

Vil du komme i kontakt med oss?

Hei jeg heter José Manuel Rodríguez , International Sales Director av BIOROCK. Kontakt oss nå for en GRATIS prosjektvurdering.

Hvor befinner du deg?

Hvem er du?

Dine kontaktdata

Landskode angis automatisk etter valg av land

Hva er din interesse?

Hvis du velger annet, vennligst spesifiser i emnefeltet

Hvordan kan vi hjelpe deg?